HomePage > Warehouse > Sichuan > Chengdu > R5101131812002

0

18.00㎡·month

1900

Under Construction

Notice:Searching warehouse in this website is for free, if there is anyone in the name of this website to charge you, please confirm his/her identity and call 4008-567-150 or contact online customer service representative.

Details

Heighth of Park Gates
4.2m
More
Num of Park Gates
2
Width of Park Gates
4m
More
Total Space
10000 ㎡
More
Bonded Warehouse
No
More
Divided
Yes
Fire-proof Level
Applicable to C2 goods
More
Floor Material
Emery
More
Supporting Facilities
Office
More
Security
Basic(Alarms, Warning Lamps)
Security Guards
Cameras
More
Supply Voltage
220V
More
Power Supply Mode
Double Channel Power
More
Architectural Structure
Steel Structure
More

Introduction

1, traffic is very convenient to cotton high speed of high-speed toll station about 10 kilometers, 8 kilometers away from sichuan and macro logistics park, about 20 km from xindu transfar logistics park;,2, operation work platform before 35 meters, which can realize trailer t stop work;,3, ventilation moistureproof ground elevation 1.2 meters, ventilation cooling, well protected against dampness moisture;,4, loading and unloading convenient tower of warehouse is equipped with eight doors, a total of 8 sets of lift platform, which can realize automation operation.,5, safe and convenient door security room, independent warehouse is equipped with a variety of fire equipment, ensure the safety of the goods,6, professional logistics service supply chain can provide transportation, storage, loading and unloading handling, distribution, packaging, circulation processing, information processing and logistics services,7, warehousing services formal invoice.

Location

All warehouse information on this website is for reference only.